| Project Name | Max test load(kN) | Pile Diameter(M) | Quantity(NO.) |
|---|---|---|---|
|
Lalin Railway Consturction,Xizang |
11700/14000/14750/19000/22800/33400/47500 |
1.25/1.5 |
21 |
|
Cijiaolin Bridge,Lasha, Xizang |
16000 |
1.5 |
2 |
|
Divisional headquarters building of Kashi Economic Development Zone,Xinjiang |
6600 |
0.8 |
2 |
|
Wulumuqi Metro Line One,Xinjiang |
32000 |
1.5 |
4 |
|
Wulumuqi Center Garden,Xinjiang |
11000/15600/17800 |
1/1.2/1.3 |
3 |
|
Humen Second Bridge,Guangdong |
207000/200000/116000 |
2.8/2.8/2.5 |
3 |
|
Xiamen to Shenzhen railway,Chaozhou* |
4000/7000 |
0.8/1.2 |
9 |
|
Chengdu-Guiyang,Leshan-Guiyan Dadu River Bridge,Sichuang* |
13000/11000/9000 |
1.5/1.25/1.0 |
6 |
|
Yibin Dream City,Sichuang |
6000 |
0.9 |
3 |
|
Binhai International Airport,Tianjin |
5500/25000/44000 |
0.8/2.2/2.2 |
7 |
|
Coastal Outer Ring Expressway of Binhai New District Railway,Tianjin |
12000/19000 |
1.5/1.8 |
2 |
|
Metro Line Five,Tianjin* |
10000/25000 |
0.8/2 |
60 |
|
Metro Line Six,Tianjin |
10000/25000 |
0.8/2 |
60 |
|
Chunyi Bridge of Sea River,Tianjin |
16000 |
1.8 |
2 |
|
Kaiqi Bridge of Sea River,Tianjin* |
22000/7000 |
1.8/1.0 |
3 |
|
South Tianjin Train Station |
5000/8000 |
0.8/1.2 |
17 |
|
Bloc A Apartment of Modern City,Tianjin |
20000/23000/25000 |
0.9/1 |
9 |
|
Z4 line of Binhai New District Railway,Tianjin |
10000 |
1 |
8 |
|
Zhonghe Road Station,Metro Line2,Hangzhou |
18000/21000 |
1.3/1.6 |
3 |
|
Hangzhou [2015]No.40 Bloc,Zhejiang |
5500/6700 |
0.7/0.8 |
6 |
|
Completion project of Shixiang Road,Hangzhou,Zhejiang |
16000/24000/44000 |
1.5/1.8/2.5 |
21 |
|
Livestock wharf of Ibrahim,Sudan |
8000/10000 |
1.2/1.5 |
2 |
|
Jiubao Bridge,Hangzhou |
18200/21200 |
1.5/1.8 |
3 |
|
A 3-Storey Factory Extension,Singapore |
13700/13340 |
1/1.2 |
2 |
|
A new 4-storey,Singapore (No.79 Joo Koon Circle, Singapore) |
11600/14200 |
1/1.1 |
2 |
|
A 5-storey Building,Singapore (Building at No.231A Pandan Loop, Singapore) |
14250 |
0.9 |
1 |
|
Lanxi Jinjiao Bridge,Zhejiang* |
28000/37000 |
1.5/2.0 |
3 |
Remark: The project with* is working pile.